This activity is used to perform the mechanical completion and commissioning, which includes testing and checking the equipment as defined by the MC check record specification. This is done to confirm that prefabrication and installation is in accordance with drawings and specifications and ready for commissioning in a safe manner and in compliance with government, environment and project requirements.
This activity is performed outside IFS/Asset Design by suppliers, prefabrication and installation teams and answered with status codes. Typical examples of check record status codes and what they stand for are:
Note: Incomplete work, with status codes PA and PB, can be documented and created as a punch item.