Create Employee
Explanation
Use this activity to either connect an existing, non
maintenance employee to a maintenance organization, or to establish a new (maintenance)
employee. You can also enter contact information for the employee such as phone
number, e-mail etc as well as specify the maximum resource load.
If you wish to use a supplier as a resource when
preparing and reporting in work order, you can establish the supplier as an
employee and connect the supplier id to the employee id.
You can also use this activity to change the site and maintenance 
organization that an employee worked in to another site and maintenance 
organization within the same company. 
Prerequisites
  - Sites and persons must be defined in IFS/Enterprise.
- Maintenance organizations must be defined in IFS/Basic Data for
    Maintenance. 
System Effects
As a result of this activity, you will be able to
assign operation lines to the employee, enter the employee as work leader or work
master, report time for the employee etc. 
Window
Organization 
Basic Data
Related Window Descriptions
Organization Basic Data 
Organization 
Basic Data/Employees
Change Employee Site
Procedure
  - Open the Organization Basic Data window and click the 
	Employees
    tab. Create a new record (F5). 
- In the  Signature field, use the List of Values to select a signature. The
     Employee ID and the  Name fields are automatically
    populated. If you need to enter new information on an employee right-click
    on the window and click Add Person. 
- The user's default site is displayed in the Site
    field.  Use the List of Values to select a suitable value. The List
    of Values will only display the sites that the user is connected to.
- Specify a maintenance organization in the Maint. Org. field. Use
    the List of Values to select a suitable value.
- Specify the availability of the employee's work time
    for pre planning  in the Maximum Load field. You can enter a value between 0 and
    100. For
    example, assume an employee works 8 hours a day, if the value in the  Maximum Load field
    is set to 50 this means that the employee
    could be pre planned for 4 hours, i.e., 50% of his work time. 
- Enter optional information in the remaining fields.
- Save the information (F12).
It is also possible to change the site of an established employee using the 
steps below:
	- On the 
	Employees tab, query for the employee (F3) that you 
	want to transfer to another site.
- Right click and then click Change Employee Site. 
	The previously defined Site and Maintenance Organization are displayed.
- Specify the new site in the Site field. Click List in this 
	field to select another site in the same company to which you want to 
	transfer the employee.
- Specify a new maintenance organization on the new site in the Maint. Org. 
	field. Click List in this field to select a suitable maintenance 
	organization.
- Click OK.