Register Delivery Project

Explanation

The new delivery project must already exist as a project in IFS/Project. You can register all projects in IFS/Project as delivery projects.

The top item can be entered at any time and can be modified later, depending on its status and if an object (e.g., a supply request) has been connected to it.

The status of the top item can also be specified at the time of registration. If status Designed has been selected, the top item and all the items in the structure will be in Designed status. If not specified, the top item's status is Defined by default.

The value of the Remove Sub Structure flag determines whether the components of the standard planned, PMRP planned or DOP parts are kept or removed from the project product structure. Possible values are Always, Prompt and Never. If not specified, the value of this flag is Prompt by default.

It is also possible to define a project cost element for the work cost and the material cost, for each project. These cost elements will be used when the costs are retrieved from an engineering part to the project item.

Prerequisites

System Effects

Window

Delivery Projects

Related Window Descriptions

Delivery Projects

Procedure

  1. Create a new record.
  2. Enter Project ID or select it from the List of Values.
  3. Enter the project site.
  4. Click Save.
  5. If desired, enter the top part number, its revision and default status.
  6. Select an appropriate value for the Remove Sub Structure flag.
  7. If desired, enter project cost elements for work cost and material cost so that these costs can be reported from the engineering part to the project item. Enter an appropriate cost element to retrieve the material cost, in the PDM Material Cost Element field, and work cost in the PDM Work Cost Element field.
  8. The cost element you enter for the work cost will be the same cost element which is used to retrieve the hours from the engineering part to the project item.
  9. Save your changes.