The new delivery project must already exist as a project in IFS/Project. You can register all projects in IFS/Project as delivery projects.
The top item can be entered at any time
and can be modified later, depending on its status and if an object (e.g., a
supply request) has been connected to it.
The status of the top item can also be specified at the time of registration. If
status Designed has been selected, the top item and all the items in the
structure will be in Designed status. If not
specified, the top item's status is Defined by default.
The value of the Remove Sub Structure flag determines whether the components of the standard planned, PMRP planned or DOP parts are kept or removed from the project product structure. Possible values are Always, Prompt and Never. If not specified, the value of this flag is Prompt by default.
It is also possible to define a project cost element for the work cost and the material cost, for each project. These cost elements will be used when the costs are retrieved from an engineering part to the project item.