Calculate CAMRO and CRO Interim Order Structure Costs

Explanation

Use this activity to calculate estimated or actual costs associated with the interim order structure. This will calculate level and accumulated costs corresponding to a specific interim order in the order structure and cumulatively up to a level in the structure respectively. For both disassembly and assembly structures, the accumulated costs are calculated in the conventional cost rollup manner.

Estimated Cost Calculation

Costs will be calculated for each level, considering operation costs from the CAMRO Interim Order/Operations tab since changes could have been made in the Operation tab from the original routing used. If shop orders have been created, the estimated cost calculation picks up costs from the pegged shop orders instead of calculating level costs using the order structure. This calculation is frozen when the shop orders reach the Started state. The system will use the cost template ID for the parts and the template's associated cost buckets. If the part ownership for a component line is specified as Customer Owned or Supplier Loaned, or the supply code is Maintenance Repair and Overhaul, no material cost will be calculated but machine and labor costs will be calculated.

Actual Cost Calculation

Orders related to the order structure will accumulate costs during shop order execution. Once execution costs have been created, the actual costs for an order structure can be rolled up. A shop order component line that is specified as either Customer Owned or Supplier Loaned will not add any cost to the actual cost. If the supply code of the shop order component line is Maintenance Repair and Overhaul, there will be no cost contribution to the actual cost. The actual cost calculation uses the reported machine and labor time in the shop order. It is recommended that you perform the actual cost calculation when all the shop orders have been closed.

Prerequisites

The interim order structure for which costs are being calculated cannot be in Canceled or Closed state. In addition, for Actual Cost but not Estimated Cost calculations, at least some of the interim orders in the order structure must be released and and have operations reported on their corresponding supply shop orders. Work center costs must have been defined. Parts must have been assigned to proper cost templates and cost buckets.

System Effects

N/A

Window

CAMRO Interim Order Structure
CRO Interim Order Structure

Related Window Descriptions

CAMRO Interim Order Structure
CRO Interim Order Structure

Procedure

  1. From the Interim Header ID list, select the interim order structure for which you wish to calculate costs.
  2. Right-click and click Calculate Costs to calculate the estimated or actual costs by interim order and cumulative to a level in the order structure.