Approve Permit
Explanation
Use this activity to approve a permit. An 
approved permit does not usually require a revision, however if such a 
requirement does arise you can revise it by changing the status to Under 
Preparation 
(right-click, point to Permit Status and click Revise). 
When the revision has been made you can once again approve the permit.
In addition, a permit with the Preparation Approved 
status can also be 
cancelled if required, provided no isolation orders are connected to it.
Prerequisites
A permit must have been defined and isolation orders 
connected (if required) in the 
Permit window .
System Effects
As a result of this activity the permit is approved, 
and will receive the Preparation Approved status. 
Window
Permits 
Permit
Related Window Descriptions
Permits 
Permit 
Permit/Prepare
Procedure
	- Open the 
	 Permit window and query for 
	the permit that should be approved (F3).
- Click the 
	Prepare tab and enter the 
	signature of the employee who prepared the permit in the Prepared By 
	field. Use the List of Values to select a suitable value.
	
- Enter the signature of the work leader. Use the 
	List of Values to select a suitable value.
- Save the information (F12).
- Right-click on the window, 
	point to Permit Status and click Prepare.
	
- Next enter a 
	value in the Approved By field. Use the List of Values to select a 
	suitable value.
- Save the information (F12).
- Right-click, point to Permit Status and click Approve Preparation.