Release Permit
Explanation
Use this activity to release the permit so that it can be used during the 
execution of the . In order to do this, you have to prepare and approve the permit first. 
If the permit is connected to an isolation order the
establishment must have been completed before the permit can be released. 
Prerequisites
  - The permit must have the Preparation Approved status. 
	
- The connected isolation orders should be established, i.e., the status 
	of the isolation order should be Establishment Complete.
- The work leader for both the permit and work order should be the same.
System Effects
As a result of this activity, the permit receives the Release status and is valid for use 
during the execution of the work order. 
Window
Permits 
Permit
Related Window Descriptions
Permits 
Permit
Permit/Prepare
 
Procedure
  - Open the 
	Permit window and query for 
	an approved permit (F3).
- Make sure the permit contains the correct 
	information. Revise if necessary.
- Right-click on the window, point to Permit 
	Status and click Release.