Complete Safety Actions for Risk Assessment
Explanation
This activity is used to complete the safety actions connected to control
measures and personnel groups in the risk assessment.
Prerequisites
In order to perform this activity;
- Control measures are required to be defined for the risk assessment in
the Risk Assessment/Hazards/Risk Control Measures tab.
- Personnel groups at risk by a selected hazard (linked to the risk
assessment) are required to be defined in the Risk Assessment/Hazards/Risk
Control Measures tab.
System Effects
There are no system effects.
Window
Risk
Assessment
Related Window Descriptions
Risk Assessment
Procedure
- Open the Risk Assessment window.
- Search or populate to find the required risk assessment.
- In the Hazard navigator, select a hazard ID. The
Risk Control Measures tab and the
Potential Harm tab will be enabled.
- Go to the
Potential Harm tab and select a personnel group connected to the
hazard. The safety actions linked to the personnel group will show in the
Safety Actions table.
- Select the required safety action, right-click and click Complete.
The status of the safety action will change to Completed.
- Go to the
Risk Control Measures tab and select a control measure. The safety
actions linked to the control measure will show in the Safety Actions
table.
- Select the required safety action, right-click and click Complete.
The status of the safety action will change to Completed.