Perform a Detailed Revision Transfer for a Site

Explanation

Use this activity to start a detailed transfer of an engineering revision to a site. You can select whether you want to do a single level transfer or transfer all levels of the part. Only one engineering revision can be transferred at a time.

Prerequisites

This activity has the following prerequisites:

System Effects

As a result of this activity:

Window

Engineering Revision Transfers
Engineering Revision Transfer Actions

Related Window Descriptions

Engineering Revision Transfers
Engineering Revision Transfer Actions

Procedure

Engineering Revision Transfers :

  1. Open the Engineering Revision Transfers window.
  2. Select the destination site in the Current Site field. Click List of Values to select from available sites.
  3. Populate (F2) to retrieve the part records.
  4. Select the engineering revision for which you want to start a detailed transfer.
  5. Right-click, then click Detailed Transfer.
  6. Select either Single Level Transfer or All Level Transfer, depending on the levels you want to transfer.
  7. If you want to create prototype structures via an engineering transfer, select the Create Prototype Structure check box.
  8. Click OK.

Engineering Revision Transfer Actions:

  1. Open the Engineering Revision Transfer Actions window.
  2. Select the engineering revision for which you want to start a detailed transfer.
  3. Right-click, then click Detailed Transfer.
  4. Select either Single Level Transfer or All Level Transfer, depending on the levels you want to transfer.
  5. If you want to create prototype structures via an engineering transfer, select the Create Prototype Structure check box.
  6. Click OK.