Define Post Maintenance Checks on Modification

Explanation

This activity is used to define post maintenance checks for a modification. The purpose of a post maintenance check is to perform inspections after the modification is complied with to ensure that no consequences are introduced. Each post maintenance check is created as a pending task as soon as the planned task date of the check is within the given number of days of forewarning. Only one check per modification or serial may be pending or running at the same time.

Prerequisites

To perform this activity, the modification must have the Preliminary status.

System Effects

When a serial has complied with a modification having post maintenance checks, a pending task is created as soon as the planned task date of the check is within the given number of days forewarning.

Window

Define Modification

Related Window Descriptions

Define Modification/Define Post Maint

Procedure

  1. Open the Define Modification window and query (F3) for the modification revision for which you want to register post maintenance checks.
  2. Click the Define Post Maint tab.
  3. Select the Enable Post Maintenance Check check box.
  4. Enter a value in Days Forewarning field to determine how many days before the check is due that the post maintenance check (PMC) task should be created.
  5. In the Interval field, enter a value for the post maintenance check to become due. If this field is entered, the fields Oper Param and Interval Limit are also required.
  6. If the post maintenance check is to take place based on time (instead of or in addition to operational use), you must enter the number of days or months etc. in the Cal. Interval field. If a value is entered in Cal Interval, Cal. Unit and Cal. Limit are also required.
  7. In the Task Remark field, enter any additional information on the post maintenance check for the modification. Entering a value in this field is optional. Double-clicking on the field will open a text editor where you can enter text in a more convenient fashion. When an PMC task is created for the modification, this information will be transferred to the Task Remark field of the corresponding task record on the maintenance order.
  8. Save the information (F12).