Define Post Maintenance Checks on Modification
Explanation
This activity is used to define post maintenance checks for
a modification. The purpose of a post maintenance check is to perform
inspections after the modification is complied with to ensure that no
consequences are introduced. Each post maintenance check is created as a pending task as soon as the planned task date
of the check is within the given number of days of forewarning. Only one check
per modification or serial may be pending or running at the same time.
Prerequisites
To perform this activity, the modification must have the Preliminary
status.
System Effects
When a serial has complied with a modification having post maintenance checks, a pending task
is created as soon
as the planned task date of the check is within the given number of
days
forewarning.
Window
Define
Modification
Related Window Descriptions
Define
Modification/Define Post Maint
Procedure
- Open the Define
Modification window and query (F3) for the modification revision for
which
you want to register post maintenance checks.
- Click the Define Post Maint tab.
- Select the Enable Post Maintenance Check check box.
- Enter a value in Days Forewarning field to determine how many
days before the check is due that the post maintenance check (PMC) task should be
created.
- In the Interval field, enter a value for the post maintenance check
to become due. If this field is entered, the
fields Oper Param and Interval Limit are also required.
- If the post maintenance check is to take place based
on time (instead of or in addition to operational use), you must enter the number
of days or months etc. in the Cal. Interval field. If a value
is entered in Cal Interval, Cal. Unit and Cal. Limit
are also required.
- In the Task Remark field, enter any
additional information on the post maintenance check for the modification. Entering a value in this field
is optional. Double-clicking on the field will open a text editor where you can
enter text in a more convenient fashion. When an PMC task is created for the
modification, this information will be transferred to the Task Remark
field of the corresponding task record on the maintenance order.
- Save the information (F12).