Manage Warehouse Tasks Planning

Explanation

This activity is used to manage and plan a warehouse task by using multiple filtrations and also assign or reassign a worker. It is also possible for the  planner to look at the current and future work load and resource availability balance, as well as ways of making quick changes to the system in order to regain a convenient work load or resource availability balance. This includes both very radical mass changes and small ad hoc changes to both basic data and the current set of open warehouse tasks.        

Task prioritizing option is a unique feature that you can do using this activity. After assigning tasks to a specific worker, the manager can prioritize them as he wish. After prioritizing it is not possible to change the worker ID. Every other day the system will generate a new sequence of numbers.

Prerequisites

System Effects

As a result of this activity:

Window

Warehouse Manager Task Planning
Assign/Reassign Worker
Warehouse Tasks
Workload per Location Group Graph
Workload per Location Group

Related Window Descriptions

Warehouse Manager Task Planning
Assign/Reassign Worker
Warehouse Tasks
Workload per Location Group Graph
Workload per Location Group

Procedure

  1. Open the Warehouse Manager Task Planning window.
  2. Populate or query for the required site in the Site field.
  3. If you need to filter the required data for the site use  the options in the Task Type Parameters area and the Assignment area and click Retrieve. If you select the Assigned option in the Assignment area, the Worker ID field will be enabled and you can enter the required ID of the worker. If you wish to filter by the location group, enter the required location group using the List of Values in the Location Group filed in the header area and then click Retrieve.
  4. If you need to change the status of a retrieved tasks: Select the required task ID, right click and then click either Plan, Release or Start options according to your requirement.
  5. If you need more information about a warehouse task, right-click and then click Warehouse Task option.
  6. If you need to prioritize a warehouse task, you can select the required warehouse task(s), right-click and then click Prioritize option.
  7. If you need to assign or reassign a worker to a specific task, select the required task(s), right-click and then click Assign/Reassign option.

If you want to see the current work load and resource situation:

  1. Open the Workload per Location Group or the Workload per Location Group Graph  window you want to see the information graphically.
  2. Select the site, warehouse task type, and location group that you want to see in the upper part of the window. In the lower part of the window, you will now see the tasks that are waiting to be executed, together with the work resources.

If you want to change the status of the warehouse task:

  1. Open the Warehouse Tasks window.
  2. Select the warehouse tasks that you want to change the status, right-click and then click the required status.
  3. Save the record.