Use this activity to create a site that can be used by Constraint Based Scheduling (CBS). This activity must be performed in order to set up a site to use Constraint Based Scheduling either via the Scheduling Server or the Advanced Planning Board. This task is to be performed by a system administrator or equivalent person.
Note: Site '*' is not allowed in a CBS installation.
This activity requires that a site must have been created in the Site window.
As a result of this activity the system creates a site that can be connected to a Scheduling Server or used with the Advanced Planning Board, allowing you to use some or all of the different functions in the Constraint Based Scheduler.