Set Up Priority Rule(s) per Site
Explanation
Use this activity to set up the different priority rules to be used on a site. The
priorities are used when processing the reservation order during automatic order
processing or when scheduling shop orders using the Constraint Based Scheduler.
Prerequisites
This activity requires that a shop order exists.
System Effects
As a result of this activity the system defines the different priority rules used for
a shop order.
Window
Shop Order Basic Data/Shop Order Priority
Related Window Descriptions
Shop Order Basic Data/Shop Order Priority
Procedure
- Click New.
- In the Site field, specify the site for which to create the priority rule.
Use the List
of Values to choose from available sites.
- Enter the priority category in the Priority Category field, then enter its description in
the Priority Description field.
- In the Adjustment Factor field, specify the factor to be used to adjust
the priority of orders. A higher percentage increases the priority of an order, while a
lower percentage has the opposite effect.
- Save the record.