Set Up Priority Rule(s) per Site

Explanation

Use this activity to set up the different priority rules to be used on a site. The priorities are used when processing the reservation order during automatic order processing or when scheduling shop orders using the Constraint Based Scheduler.

Prerequisites

This activity requires that a shop order exists.

System Effects

As a result of this activity the system defines the different priority rules used for a shop order.

Window

Shop Order Basic Data/Shop Order Priority

Related Window Descriptions

Shop Order Basic Data/Shop Order Priority

Procedure

  1. Click New.
  2. In the Site field, specify the site for which to create the priority rule. Use the List of Values to choose from available sites.
  3. Enter the priority category in the Priority Category field, then enter its description in the Priority Description field.
  4. In the Adjustment Factor field, specify the factor to be used to adjust the priority of orders. A higher percentage increases the priority of an order, while a lower percentage has the opposite effect.
  5. Save the record.