Mark Structure Component as Not Present
Explanation
This activity is
used to remove a structure component that was not present in the actual structure
received to the repair from the new as-built structure created after the
repair.
Prerequisites
Multilevel repair
shop order must exist with the parent part in Reserved or Issued state.
System
Effects
As a result of
this activity, the component marked as Not Present will not be added in
the new as-built structure. Since there is no existing component, there will be no
inventory transactions as well.
Window
Shop Order
Related
Window Descriptions
Component Replacement Details
Procedure
-
Open the
Shop Order
window
and query for your multilevel repair shop order.
-
Make sure that the state
of the parent material line is Reserved or Issued.
-
Open the
Multilevel Repair Structure
tab.
-
Select the top part from
the graphical tree structure, right-click and then click Expand Descendents.
-
Select the revision node
of the parent part in which you want to mark a component as not present.
-
Right-click and then click
Component Replacement to open the Component Replacement Details dialog
box
with the parent part you selected in the header as the parent part.
-
Select the component line you
wish to mark as not present and then change the Repair Action to
Not Present.
-
Enter the repair reason
for the structure changes. Here you can get the List of Values.
-
Click Apply or OK.