Receipt with Edit Components
Explanation
Use this activity to report production that was performed with edited components. This
allows you to edit a copy of the product structure to include component substitutions or
variations. You also can create manual assignments for a given structural component for
specific locations, lot/batches, deviation numbers, etc. These are issued when the
backflush occurs.
Prerequisites
- This activity requires that scheduled quantities for the part exist.
- A part must
be associated with a production line.
System Effects
- As a result of this activity the system backflushes the components and operations
used in the manufacturing process.
- If making a scheduled receipt, the system automatically
updates the production schedule.
- If making an unscheduled receipt, the system does not
automatically update the production schedule.
- If inbound locations are defined, they are
used by the backflush in its search hierarchy.
- If an alternate component substitution
sequence is defined, it is used by the backflush when issuing material.
- Inventory
transactions are created for the receipt, as well as all backflushed components.
- If
routings are used, operation history transactions are created for backflushed machine and
labor operations.
Window
Production
Receipt
Production
Schedule By Line
Production Schedule
By Line Part
Related Window Descriptions
Production Receipt
Production Schedule by Line
Production Schedule by Line Part
Production Receipt Material
Production Receipt Reservation
Procedure
From the
Production Receipt window:
- Open the
Production Receipt window.
- In the Production Line list, select the production line and part for which
to report production.
- In the Sched Option list, select Scheduled or Unscheduled.
- In the Structure area, specify either the
structure/routing revision, or the structure/routing alternate.
- In the Backflush list, select Immediate Backflush or Defer
Backflush.
- In the Location area, click in the Location No field, then click
List
to choose from different inventory locations. Next, type the quantity to receive in the
Quantity Received field. Material can be received into more than one inventory location.
If the part is catch unit enabled, enter the catch quantity
received in the Catch Quantity Received field.
- To change inventory locations, create a new record. Click in the Location No
field, then
click List to choose from available locations. In the Quantity Received
field,
type the quantity of parts to receive.
- Select the Edit Components check box.
- Save. The
Production Receipt Material
dialog box will appear.
- In the
Production Receipt Material dialog box, type a value in the
Qty To Issue field.
- To change the quantity to issue, type a value in the Part To Issue field. Click
List
to select from available parts. Next, type a value in the Qty to Issue
field.
- Save.
- To reserve the components before backflushing, select the components, then click
Assign.
The
Production Receipt Reservation dialog box will
appear.
- In the
Production Receipt Reservation dialog box, click
Create.
The
Inventory Part Location dialog box will
appear.
- In the
Inventory Part Location dialog box, selection a location.
Click OK.
- In the
Production Receipt Reservation dialog box, type a value in
the Qty Assigned field. Save and then click OK when the reservations
are finished.
- When you have finished editing and reserving components, click OK to run
the backflush.
From the
Production Schedule by Line window:
- Open the
Production Schedule By Line window.
- In the Production Line list, select the production line for which to report
production.
- Select the production schedule line for which to report production.
Right-click and then click Production Receipt. The
Production Receipt
dialog box will appear.
- In the
Production Receipt dialog box, specify how many parts you
want to report and receive into inventory in the Qty Reported field. The scheduled
quantity is the default value. If the part is catch
unit enabled, enter the catch quantity
received in the Catch Quantity Received field.
- In the Sched Option list, select
Scheduled or Unscheduled.
- In the Backflush list, select Immediate
Backflush or Defer
Backflush.
- In the Structure area, specify the structure revision
and structure alternate. If desired, you can specify the routing revision and the routing
alternate.
- In the Location area, select the Complete check box to create a
complete production receipt.
- In the Location area, click in the Location No field, then click
List
to choose from different inventory locations.
- To edit components, click Components. The
Production Receipt
Material dialog box will appear.
- In the
Production Receipt Material dialog box, type a value in the
Qty To Issue field.
- To change components, create a new record. The cursor appears in the Part To Issue
field. Click List to select from available parts. Next, type a value in
Qty to
Issue field.
- Save.
- To reserve the components before backflushing, select the components, then click
Assign.
The
Production Receipt Reservation dialog box will
appear.
- In the
Production Receipt Reservation dialog box, click
Create.
The
Inventory Part Location dialog box will
appear.
- In the
Inventory Part Location dialog box, select a location.
Click OK.
- In the
Production Receipt Reservation dialog box, type a value in
the Qty Assigned field. Save and then click OK when the reservations
are finished.
- When you are finished editing and reserving components, click OK to run
the backflush.
From the
Production Schedule by Line Part window:
- Open the
Production Schedule by Line Part
window.
- In the Part No list, select the part for which to report production.
- Select the production schedule line for which to report production.
Right-click and
then click Production Receipt. The
Production Receipt
dialog box will appear.
- In the
Production Receipt dialog box, specify how many parts you
want to report and receive into inventory in the Qty Reported field. The scheduled
quantity is the default value.
If the part is catch unit enabled, enter the catch quantity
received in the Catch Quantity Received field.
- In the Backflush list, select Immediate Backflush or Defer
Backflush.
- In the Structure area, specify the structure revision
and structure alternate. If desired, you can specify the routing revision and the routing
alternate.
- Select the Complete check box to create a complete production receipt.
- In the Location area, click in the Location No field, then click
List
to choose from different inventory locations.
- To edit components, click Components. The
Production Receipt
Material dialog box will appear.
- In the
Production Receipt Material dialog box, type a value in the
Qty To Issue field.
- To change components, create a new record. The cursor appears in the Part To Issue
field. Click List to select from available parts. Next, type a value in
Qty to
Issue field.
- Save.
- To reserve the components before backflushing, select the components, then click
Assign.
The
Production Receipt Reservation dialog box will
appear.
- In the
Production Receipt Reservation dialog box, type a value in
the Qty Assigned field. Save and then click OK when the reservations
are finished.
- When you have finished editing and reserving components, click OK to
run the backflush.