Receipt with Edit Components
Explanation
Use this activity to report production that was performed with edited components. This
allows you to edit a copy of the product structure to include component substitutions or
variations. You also can create manual assignments for a given structural component for
specific locations, lot/batches, deviation numbers, etc. These are issued when the
backflush occurs. 
Prerequisites
	- This activity requires that scheduled quantities for the part exist. 
- A part must
be associated with a production line. 
System Effects 
	- As a result of this activity the system backflushes the components and operations
used in the manufacturing process.
- If making a scheduled receipt, the system automatically
updates the production schedule.
- If making an unscheduled receipt, the system does not
automatically update the production schedule.
- If inbound locations are defined, they are
used by the backflush in its search hierarchy. 
- If an alternate component substitution
sequence is defined, it is used by the backflush when issuing material.
- Inventory
transactions are created for the receipt, as well as all backflushed components.
- If
routings are used, operation history transactions are created for backflushed machine and
labor operations.
Window
Production
Receipt
Production
Schedule By Line
 
Production Schedule
By Line Part
Related Window Descriptions
Production Receipt  
Production Schedule by Line
 Production Schedule by Line Part
 Production Receipt Material
 Production Receipt Reservation
Procedure
From the 
Production Receipt window: 
  - Open the 
	Production Receipt window. 
	
- In the Production Line list, select the production line and part for which
    to report production.
- In the Sched Option list, select Scheduled or Unscheduled.
- In the Structure area, specify either the
    structure/routing revision, or the structure/routing alternate.
- In the Backflush list, select Immediate Backflush or Defer
    Backflush.
- In the Location area, click in the  Location No field, then click
    List
    to choose from different inventory locations. Next, type the quantity to receive in the
    
    Quantity Received field. Material can be received into more than one inventory location. 
	If the part is catch unit enabled, enter the catch quantity 
	received in the  Catch Quantity Received field. 
- To change inventory locations, create a new record. Click in the  Location No
    field, then
    click List to choose from available locations. In the  Quantity Received
    field,
    type the quantity of parts to receive.
- Select the Edit Components check box.
- Save. The 
	Production Receipt Material 
	dialog box will appear.
- In the 
	Production Receipt Material dialog box, type a value in the
    
    Qty To Issue field. 
- To change the quantity to issue, type a value in the  Part To Issue field. Click
    List
    to select from available parts. Next, type a value in the  Qty to Issue
    field.
- Save.
- To reserve the components before backflushing, select the components, then click
    Assign.
    The 
	Production Receipt Reservation dialog box will 
	appear.
- In the 
	Production Receipt Reservation dialog box, click
    Create.
    The 
	Inventory Part Location dialog box will 
	appear.
- In the 
	Inventory Part Location dialog box, selection a location.
    Click OK.
- In the 
	Production Receipt Reservation dialog box, type a value in
    the  Qty Assigned field. Save and then click OK when the reservations
    are finished.
- When you have finished editing and reserving components, click OK to run
    the backflush.
From the 
Production Schedule by Line window: 
  - Open the  
	Production Schedule By Line window. 
	
- In the Production Line list, select the production line for which to report
    production.
- Select the production schedule line for which to report production. 
  Right-click and then click Production Receipt. The 
	Production Receipt 
	dialog box will appear.
- In the 
	Production Receipt dialog box, specify how many parts you
    want to report and receive into inventory in the  Qty Reported field. The scheduled
    quantity is the default value. If the part is catch
    unit enabled, enter the catch quantity 
	received in the  Catch Quantity Received field.
 
- In the  Sched Option   list, select 
	Scheduled or Unscheduled.
- In the Backflush list, select Immediate 
	Backflush or Defer
    Backflush.
- In the Structure area, specify the structure revision
    and structure alternate. If desired, you can specify the routing revision and the routing
    alternate.
- In the Location area, select the Complete check box to create a
    complete production receipt.
- In the Location area, click in the  Location No field, then click
    List
    to choose from different inventory locations. 
- To edit components, click Components. The 
	Production Receipt
    Material dialog box will appear.
- In the 
	Production Receipt Material dialog box, type a value in the
    
    Qty To Issue field.
- To change components, create a new record. The cursor appears in the  Part To Issue
    field. Click List to select from available parts. Next, type a value in
     Qty to
    Issue field.
- Save.
- To reserve the components before backflushing, select the components, then click
    Assign.
    The 
	Production Receipt Reservation dialog box will 
	appear.
- In the 
	Production Receipt Reservation dialog box, click
    Create.
    The 
	Inventory Part Location dialog box will 
	appear.
- In the 
	Inventory Part Location dialog box, select a location.
    Click OK.
- In the 
	Production Receipt Reservation dialog box, type a value in
    the  Qty Assigned field. Save and then click OK when the reservations
    are finished.
- When you are finished editing and reserving components, click OK to run
    the backflush.
From the 
Production Schedule by Line Part window: 
  - Open the 
	Production Schedule by Line Part 
	window. 
- In the Part No list, select the part for which to report production.
- Select the production schedule line for which to report production. 
	Right-click and
    then click Production Receipt. The 
	Production Receipt 
	dialog box will appear.
- In the 
	Production Receipt dialog box, specify how many parts you
    want to report and receive into inventory in the  Qty Reported field. The scheduled
    quantity is the default value.  
	If the part is catch unit enabled, enter the catch quantity 
	received in the  Catch Quantity Received field.
 
- In the Backflush list, select Immediate Backflush or Defer
    Backflush.
- In the Structure area, specify the structure revision
    and structure alternate. If desired, you can specify the routing revision and the routing
    alternate.
- Select the Complete check box to create a complete production receipt.
- In the Location area, click in the  Location No field, then click
    List
    to choose from different inventory locations.
- To edit components, click Components. The 
	Production Receipt
    Material dialog box will appear. 
- In the 
	Production Receipt Material dialog box, type a value in the
    
    Qty To Issue field.
- To change components, create a new record. The cursor appears in the  Part To Issue
    field. Click List to select from available parts. Next, type a value in
     Qty to
    Issue field.
- Save.
- To reserve the components before backflushing, select the components, then click
    Assign.
    The 
	Production Receipt Reservation dialog box will 
	appear.
- In the 
	Production Receipt Reservation dialog box, type a value in
    the  Qty Assigned field. Save and then click OK when the reservations
    are finished.
- When you have finished editing and reserving components, click OK to
    run the backflush.