Use this activity to report production performed with a
serial-tracked part. A finished part or subassembly is produced, and the part is
ready to be put into inventory. Before running the backflush, the serial numbers must be
reserved for the components and the parent parts. The serial structure for the parent part
also must be built.
Note: If the inventory part has the structure effectivity set to
serial, only numeric values can be reserved as serial numbers. You cannot reserve serial
numbers that already exist in 
Part Serial or are
reserved on another order. 
Note: Repetitive production only creates information for serial structures at the 
time of receipt. It will not use information for components that are not serial 
tracked, or components that are issued or backflushed earlier than receipt, such 
as at report points. There will be no as-built structures created. 
Prerequisites
	- This activity requires that scheduled quantities for the part must exist in order to
make a scheduled receipt.
- A part must be associated with a production line. 
- The part must
be defined as an inventory serial tracking part in 
	Part. 
System Effects
	- As a result of this activity the system backflushes the components and operations used
in the manufacturing process.
- If making a scheduled receipt, the system automatically
updates the production schedule. 
- If making an unscheduled receipt, the system does not
automatically update the production schedule.
- If inbound locations are defined, they are
used by backflush in its search hierarchy. 
- If outbound locations are defined, these are
used as default receiving locations for production on the production line. 
- Inventory
transactions are created for the receipt and all components are issued.
- Operation history
transactions are created for any backflushed machine or labor operations. The multi-level
serial structure is written to history for future tracking. If the part is catch 
unit enabled, the catch quantities will be assigned here.
Window
Production
Receipt
 Production
Schedule by Line
 Production Schedule
by Line Part
Related Window Descriptions
Production Receipt
Production Schedule by Line
Production Schedule by Line Part
Production Receipt
 Production Receipt Material
Production Receipt Reservation
Production Receipt Serial
Production Receipt Serial
Structure
Procedure
From the 
Production Receipt 
window: 
  - Open the 
	Production Receipt window.
	
- In the  
	Production Line list, select the production line and part for which
    to report production.
- In the Sched Option list, select 
	 Scheduled or  
	Unscheduled.
- In the  
	Structure area, specify structure revision and
    the structure alternate. If desired, also specify the routing revision and the routing
    alternate.
- In the Backflush list, select 
	Immediate Backflush or 
	Defer
    Backflush.
- In the Location 
  area, click in the 
	Location No field, then click 
	List
    to choose from different inventory locations. Next, type the quantity to receive in the
    Quantity Received field. If the part is catch
    unit 
	enabled, then you have to enter the catch quantity received in the Catch 
	Quantity Received  field. 
    
- To change inventory locations, create a new 
  record. Click in the Location No 
	field, then
    click List
	 to choose from available locations. In the Quantity Received 
	field, type the quantity of parts to receive. 
- Select the Edit Components check box to reserve serial components.
- Save. The 
	Production Receipt Material
    dialog box will appear.
- In 
	Production Receipt Material dialog box, select the serial component
    and click Assign. The 
	Production Receipt Reservation
    dialog box will appear.
- In 
	Production Receipt Reservation, click 
	Create and
    select serial components. Save and then click 
	OK when all the
    reservations for the component are finished.
- In the 
	Production Receipt Material dialog box, click 
	OK
    when all reservations are completed.
- In the Production Receipt Serial dialog box, reserve serial
    numbers for the parent part.
- To reserve nonconsecutive serial numbers, 
  create a new record, then type the numbers in
    the Serial No column.
- To reserve a serial number range, click 
	Create Interval. 
  Create a new record,
    then specify the range in the From Serial No and To Serial No fields. To add a
    suffix and/or a prefix, type in the necessary characters in the  
	Suffix 
	and  Prefix
    areas. Click OK. 
- Change or connect the components with the specific parent part in the 
	Production
    Receipt Serial Structure window.
- To add a component in the parent part structure, select the parent part in the tree
    structure. Select the component in the table on the right side and click  
	Add to
    Structure.
- To remove a component in the parent part structure, select the component in the tree
    structure and click  Remove 
	
	Serial.
- Click OK to run the backflush.
 From the Production 
Schedule by Line 
window: 
  - Open the Production Schedule by Line 
	window. 
- In the Production Line list, select the production line for which to report
    production.
- Select the production schedule line for which to report production. 
	Right-click and then click 
	Production Receipt. The 
	Production Receipt 
	dialog box will
    appear.
- In 
	Production Receipt, specify how many parts to report and
    receive into inventory in the Qty Reported field. The scheduled quantity is the default
    value.
- In the Sched Option list, select 
	 Scheduled or 
	Unscheduled.
- In the Backflush list, select 
	Immediate Backflush or 
	Defer
    Backflush.
- In the Structure 
  area, specify the structure revision and
    the structure alternate. If desired, also specify the routing revision and the routing
    alternate.
- In the 
	Location area, select the 
	Complete check
    box to create a complete production receipt.
- In the 
	Location area, click in the 
	Location No field, then click 
	List
    to choose from different inventory locations. Next, type the quantity to receive in the
    Quantity Received field. If the part is catch
    unit 
	enabled, you have to enter the catch quantity in the Catch Quantity Received
    field.
    
- To edit components, click 
	Components. The 
	Production Receipt
    Material dialog box will appear.
- In 
	Production Receipt Material, select the serial component
    and click Assign. The 
	Production Receipt Reservation
    dialog box will appear.
- In 
	Production Receipt Reservation, click 
	Create. The 
	Inventory
    Part Location dialog box will appear. 
- In 
	Inventory Part Location, select a location. Click 
	OK.
- In 
	Production Receipt Reservation, select serial components.
    Save 
  and then click 
	OK when all the reservations are finished.
- Click OK in the 
	Production Receipt Material 
	dialog box,
    when all reservations for the components are completed.
- In the Production Receipt Serial window, reserve serial
    numbers for the parent part.
- To reserve nonconsecutive serial numbers, create a new record and type the numbers in the
    Serial No column.
- To reserve a serial number range, click 
	Create Interval. 
  Create a new record,
    then specify the range in the From Serial No and To Serial No fields. To add a
    suffix and/or a prefix, type the necessary characters in the  
	Suffix and  
	Prefix areas. Click 
	OK. 
- Change or connect the components with the specific parent part in the 
	Production
    Receipt Serial Structure dialog box.
- To add a component in the parent part structure, select the parent part in the tree
    structure. Select the component in the table on the right side and click 
	Add to
    Structure.
- To remove a component in the parent part structure, select the component in the tree
    structure and click Remove 
	Serial.
- Click OK to run the backflush.
From the 
Production Schedule by Line Part 
window: 
  - Open the 
	Production Schedule by Line 
	Part window. 
- In the Part No list, select the part for which to report production .
- Select the production schedule line for which to report production. 
	Right-click and then
    click Production Receipt. The 
	Production Receipt
    dialog box will appear.
- In 
	Production Receipt, specify how many parts to report and
    receive into inventory in the Qty Reported field. The scheduled quantity is the default
    value.
- In the Sched Option list, select 
	Scheduled or 
	Unscheduled.
- In the Backflush list, select 
	Immediate Backflush or 
	Defer
    Backflush.
- In the Structure 
  area, specify the structure revision and
    the structure alternate. If desired, also specify the routing revision and the routing
    alternate.
- Select the Complete check box to do a complete production receipt.
- In the 
	Location area, click in the 
	Location No field, then click 
	List
    to choose from different inventory locations. Next, type the quantity to receive in the
    Quantity Received column. If the part is catch
    unit 
	enabled, you have to enter the catch quantity in the Catch Quantity Received 
    field.
 	
- To edit components, click 
	Components. The 
	Production Receipt
    Material dialog box will appear.
- In 
	Production Receipt Material, select the serial component.
    Click Assign. The 
	Production Receipt Reservation 
	dialog box will appear.
- In 
	Production Receipt Reservation, click 
	Create. The 
	Inventory
    Part Location dialog box will appear. 
- In 
	Inventory Part Location, select a location. Click 
	OK.
- In the Production Receipt Reservation 
	dialog box, select
    serial components. Save and then click 
	OK when the reservations for
    the components are finished.
- Click OK in 
	Production Receipt Material when all
    reservations for the components are finished.
- In the Production Receipt Serial dialog box, reserve serial
    numbers for the parent part.
- To reserve nonconsecutive serial numbers, 
  create a new record and then type the numbers in
    the Serial No column.
- To reserve a serial number range, click 
	Create Interval. Click 
	New,
    then specify the range in the From Serial No and To Serial No fields. To add a suffix
    and/or a prefix, type in the necessary characters in the  
	Suffix and  
	Prefix
    areas. Click  OK. 
- Change or connect the components with the specific parent part in the 
	Production
    Receipt Serial Structure dialog box.
- To add a component in the parent part structure, select the parent part in the tree
    structure. Select the component in the table on the right side and click  
	Add to
    Structure.
- To remove a component in the parent part structure, select the component in the tree
    structure and click  Remove 
	
	Serial.
- Click  OK to run the backflush.