Redefine Supply Code for Component

Explanation

When a project connected shop order is created through a project miscellaneous demand, a customer order or a manual connection, the material list is always copied from manufacturing standards. If the shop order is connected to a project activity, it should be possible to issue material from either project inventory or the standard inventory. The Redefine Supply Code option for the components will change the supply code between invent order (where the material will be issued from standard inventory) and project inventory or project (where the material will be issued from project inventory).

Both project and project inventory supply codes will reserve and issue material from the relevant project inventory and behave almost the same. The only difference between them is that the project inventory type components are planned by material planning tools like PMRP, while the project type components are not.

Prerequisites

System Effects

When a shop order is created from a project miscellaneous demand with Shop Order supply option:

else,

Window

Shop Order/Material

Related Window Descriptions

Shop Order/Material

Procedure

  1. Select the desired shop order.
  2. Click the Material tab.
  3. Select the component material line/lines for which you wish to redefine the supply code.
  4. Click Redefine Supply Code from the menu.