Shop Order Load per Line

Explanation

Use this activity to analyze the workload of a particular work center during a specified interval of time. You can view the workload per day or per week. The graph at the bottom of the Load per Production Line window shows either the specified resource's available capacity or its theoretical capacity. Every load that goes over the capacity line is overload.

Prerequisites

This activity requires the existence of a defined production line associated with a work center used in a shop order.

System Effects

As a result of this activity, the system shows a graphical representation of the load per production line.

Window

Load per Production Line

Related Window Descriptions

Load per Production Line

Procedure

  1. Query or populate the window.
  2. Select the production line you want to analyze in the Line list. The current workload within the given time interval appears on the graph.
  3. If you want to study a workload for another time interval, type the dates in the From Date and To Date fields.
  4. To update the graph, reselect the production line in the Line list.
  5. If you want to study the workload per week instead of per day, select the Weekly check box. The system automatically recalculates the graph to display the weekly load.
  6. Select a value in the Show Capacity as list to indicate how capacity should be calculated for the graph.