Shop Order Load per Work Center
Explanation
Use this activity to study the workload of a particular work center during a specified
interval of time. You can study the workload per day or per week. The graph at the bottom
of the Load per Work Center window shows
either the specified
resource's available capacity or its theoretical capacity. Every load that goes over the capacity line
is overload.
Prerequisites
This activity requires the existence of a work center that is used in a shop order.
System Effects
As a result of this activity, the system shows a graphical representation of the load
per work center.
Window
Load per Work Center
Related Window Descriptions
Load per Work Center
Procedure
- Select the work center you want to study in the
Work Center No list. The
current workload within the given time interval is displayed.
- If you want to study a workload for another time interval, type the dates in the
From Date and To Date fields.
- To update the graph, reselect the work center in the
Work Center No list.
- If you want to study the workload per week instead of per day, select the
Weekly
check box.
- Select a value in the Show Capacity as list to indicate how
capacity should be calculated for the graph.