Stop Production

Explanation

This activity is used to stop a started production on one or several operations.

When calculating operation hours, the priority of calculating the operation hours should be as follows:

  1. Based on the calendar settings defined in the Manufacturing Labor Class/Employees tab.
  2. If calendar is not defined, when IFS/Human Resources is installed, refer the employee's work schedules defined in the Employee Schedules and Rules window.
  3. If employee’s schedule is day type independent or
    If IFS/Human Resources is not installed, and no valid schedule exists for the employee;
    then use the labor class calendar defined in the Basic Data for Manufacturing Labor window.

Prerequisites

The production (runtime) must have started on the operation.

System Effects

Window

Shop Floor Workbench

Related Window Descriptions

Shop Floor Workbench
Stop Production

Procedure

  1. In the Shop Floor Workbench window, select the operation line and click Stop Production.
  2. The Stop Production dialog box will open.
  3. Select an appropriate option in the Stop Reason list.
  4. Click OK. The finish time can be viewed in the Clockings tab.