Use this dialog box to change the default values for the period range to be used for generating the cumulative MS graph. When you type a new period number in the Begin Period No field, the Range Begin Date field displays the beginning date for that period. Likewise, when you type a new period number in the End Period No field, the Range End Date displays the ending date for that period.
A note regarding the default period numbers: The default value for the beginning period number is based on the site date of the site specified in the Cumulative MS Graph window. The default value for the ending period number is based on the planning time fence date for the part number selected in that window. If either the site date or the planning time fence date falls before the first period number, the period number 1 is used. If either the site date or the planning time fence date falls outside the maximum period number, the maximum period number is used. When the dialog box is first opened, the site date and the planning time fence date appear in the Range Begin Date and Range End Date fields respectively.
Perform
MS level 1
Perform MS level 0