Adjust and Verify Background Job for Recalculations of Post Maintenance Checks

Explanation

Use this activity to view calculated due dates for post maintenance tasks (PMCs). You can also use this activity to adjust the execution time of the background job (For more information, refer the online help file: Activity Using Background Jobs). At installation, the server process for due calculations for PMCs is set (by default) to execute each day at 8:00 P.M. The background job can also be executed manually for a specific post maintenance check.

Prerequisites

System Effects

Window

Modification Details
Serial Operational Information

Related Window Descriptions

Modification Details/Post Maint
Define Modification/Define Post Maint

Serial Operational Information/Post Maint

Serial Operational Information/Fault/Additional

Procedure

Follow this procedure to verify calculated tasks:

  1. Open the Modification Details window and query (F3) for the part number for which your modification is defined.
  2. Click the Post Maint tab.
  3. The calculated due date for the PMC is displayed in the Interval Due Date or Calendar Due Date fields.
  4. To perform a manual calculation, right-click and then click Recalculate.
    Alternatively, this task calculation can be performed in the Serial Operational Information window.