Recalculate Period Template
Explanation
Use this activity to recalculate the period template selected in
the Detailed MS graphic window. This
recalculation is necessary if the selected Level 0 or Level 1 part's last run date does
not match the begin date of the selected period template.
Prerequisites
This activity requires that a Level 0 or Level 1 part exists,
along with a period template.
System Effects
As a result of this activity, the system displays the
Recalculate Period Template dialog box. When you click OK in this dialog
box, the system recalculates the selected period template's begin date to make it match
the selected Level 0 or Level 1 part's last run date. This match is necessary in the
system's graph calculations.
Window
Detailed MS Graphic
Related Window Descriptions
Detailed MS Graphic
Procedure
- Populate the Detailed MS Graphic window.
Alternatively, select a Level 0 or Level 1 part in the Part No list box, then
fill out the other fields. Either type the information or use LOV.
- Choose Show Graph from the right mouse button
menu. If an error message tells you that the period template recalculation date does
not match with the selected part's last run date, choose Recalculate Period Template
from the RMB menu. The Recalculate Period
Template dialog box
appears with the part's last run date displayed in the Period 1 Begin Date field.
- Click OK to recalculate the period template to use the
part's last run date as the period template's begin date.
- From the RMB menu, choose Show Graph again.