Use this activity to manually activate a new preventive maintenance action revision (PMA revision) in order to generate work orders. A PMA revision is usually activated once all the preparation and planning have been performed on the PMA revision.
A PMA revision in the Preliminary status should exist in the system.
As a result of this activity, the PMA revision is activated. The previously active revision (if one exists) will be set to obsolete. It is now possible to generate work orders from this PMA revision.