Enter Mandatory PM Information
Explanation
Use this activity to enter mandatory information required to create a
Separate PM
action.
Prerequisites
- Information on equipments should exist in IFS/Equipment.
- Information on Actions should be entered in
Maintenance Basic Data.
- Information on maintenance organizations should be entered in
Organization BAsic Data.
- Information on operational status should be entered in
Work Order and PM Basic Data.
System Effects
As a result of this activity, a separate PM action with a unique PM number will be
created. The new PM Action will be in the Preliminary status.
Window
Separate PM Action
Related Window Descriptions
Separate PM Action
Separate PM Action/General
Procedure
- Open Separate PM Action and create a new record (F5).
- Enter an appropriate revision in the Revision field.
- In the Object ID field, enter an equipment object on which the PM action will be
performed. Use List of Values to select a suitable value.
- In the Action field, select the PM action code for what must be done.
- Click the
General tab.
- In the Operational Status field, specify the operational status of the
object during the PM action.
- In the Maint. Org field, specify the responsible maintenance
organization.
- Save the information (F12).