Enter Standard
Jobs
Explanation
Use this activity to connect
multiple standard jobs to a preventive
maintenance (PM) action. Note: Route standard
jobs can only be connected to route PM actions, and separate standard jobs can only be connected to
separate PM actions. 
Prerequisites
Information related to standard jobs must exist
    in IFS/Preventive Maintenance.
System Effects
As a result of this activity, all information regarding
operations, materials, tools and facilities, and documents that are
entered in a standard job will be copied to the PM action. 
Window
Separate PM Action
Route PM Action
Related Window Descriptions
Separate PM Action
Separate PM Action/Jobs
Route PM Action 
Route PM Action/Jobs
Procedure
  - Open one of the PM action windows (Separate PM
    Action or 
	Route PM Action).
- Create a new record (F5) or query for an existing
    one (F3).
- Click the 
	Jobs tab, and create a new
    record (F5) or select an appropriate job from the existing job lines.
- Enter a value in the Standard Job ID field.
    Use the List of Values to select a suitable value. 
- Enter an appropriate revision in the Revision
    field if more than one revision exists for the standard job. Use the
    List of Values to select a suitable value. 
- Enter the quantity of the standard job. The value in
    the  Qty field is set to 1 by default.
- 
    Save the record (F12).