Replace Obsolete Standard Job revisions
Explanation
Use this activity to replace obsolete standard job revisions
that are connected to the PM action, with active revisions. You
can either replace the revisions individually process it in batches.
Note: It is also possible to view a summary of the registered
separate and route PM actions and work orders, that have connections to obsolete
Standard jobs, to do so right-click on the
Standard Jobs,
Separate Standard Jobs or
Route Standard Jobs
windows and click Obsolete Revisions on PM Actions or Obsolete
Revisions on Active Work Orders. The right mouse button options will
only be available for the active standard job revision and not for individual
obsolete standard job revisions.
Prerequisites
- A connection between the obsolete standard job
revision and the PM action must exist.
- An active revision of the obsolete standard job revision
must exist in the system.
- The connected PM action must be in the Preliminary
or Active status.
System Effects
As a result of this activity, all occurrences of the
relevant obsolete standard
job revision, which is connected to the PM Action, will be replaced with the active
standard job revisions.
Window
Separate
Standard Job
Route Standard Job
Related Window Descriptions
Separate
Standard Job
Route Standard Job
Procedure
- Open either the
Separate Standard Job
or Route Standard Job windows and query for an active revision
(F3).
- Right-click and then click Replace Obsolete Revisions
on PM Actions. (This option will be available only when an obsolete connection
exists.)
To replace the revisions in batches:
- Open the
Replace Obsolete Standard Jobs on
PM Actions dialog box. Change the value in the Site field if
required and click OK. Alternatively you can click Default
display the default values defined by your administrator in
Database Tasks.
- Optionally click Schedule and follow the
steps in the wizard that appears if you wish to schedule the task as a
background job run automatically at predefined intervals.