Separate PM Action/Criteria

[About PM Action] [To PM Processing]

Usage

Use this tab to enter and view information on criteria limits for the parameters that are linked to the object. If the parameter is a limit value, enter minimum and maximum values. If it is a cumulative parameter, enter a start value and interval. When the criteria limits exceed, a work order is generated based on the PM action.

Activity Diagrams

Define Separate PM Action and Set Conditions

Activities

Enter Criteria for Condition Generation
Enter Min/Max Value
Enter Start Value/Interval