Add Work Guideline to DOP Component / Operations
Explanation
Use this activity to add work guidelines to a selected DOP component or an operation.
Prerequisites
The DOP component must not be in the Closed, Released, or Canceled status.
System Effects
As a result of this activity, the system adds work guidelines to a DOP component
or an operation.
Window
DOP Order,
DOP Header/Detail
DOP Header/Structure
DOP Order/ All Lover Levels
DOP Order/Components
DOP Header/Structure Multilevel
DOP Order/Operations
Related Window Descriptions
DOP Order,
DOP Header/Detail
DOP Header/Structure
DOP Order/All Lover Levels
DOP Order/Components
DOP Header/Structure Multilevel
DOP Order/Operations
Dop Component Work Guidelines
Dop Operation Work Guidelines
Select Work Guideline Template
Procedure
- Select the DOP order or header to which you want to add work guidelines.
- Click Work Guideline from the right mouse button options.
- Click to create a new line in the table.
- The guideline number and the work guideline type will be automatically displayed.
- Enter a description in the Guideline Desc field.
- To create a work guideline manually, enter information in the Guideline
Desc and Guideline Text fields.
- To use an existing work guideline template, select the new line, right-click,
then click Work Guideline Template. Select a work guideline template,
then click OK.
- Repeat steps 3—5 for each work guideline to be connected to the specific
component or operation.
- Click Save.