Add Work Guideline to DOP Component / Operations

Explanation

Use this activity to add work guidelines to a selected DOP component or an operation. 

Prerequisites

The DOP component must not be in the Closed, Released, or Canceled status. 

System Effects

As a result of this activity, the system adds work guidelines to a DOP component or an operation. 

Window

DOP Order, DOP Header/Detail
DOP Header/Structure
DOP Order/ All Lover Levels
DOP Order/Components
DOP Header/Structure Multilevel
DOP Order/Operations

Related Window Descriptions

DOP Order, DOP Header/Detail
DOP Header/Structure
DOP Order/All Lover Levels
DOP Order/Components
DOP Header/Structure Multilevel
DOP Order/Operations
Dop Component Work Guidelines
Dop Operation Work Guidelines
Select Work Guideline Template

Procedure

  1. Select the DOP order or header to which you want to add work guidelines.
  2. Click Work Guideline from the right mouse button options.
  3. Click to create a new line in the table.
  4. The guideline number and the work guideline type will be automatically displayed.
  5. Enter a description in the Guideline Desc field.
  6. To create a work guideline manually, enter information in the Guideline Desc and Guideline Text fields.
  7. To use an existing work guideline template, select the new line, right-click, then click Work Guideline Template. Select a work guideline template, then click OK.
  8. Repeat steps 3—5 for each work guideline to be connected to the specific component or operation.
  9. Click Save.