Use this function to study the results of CRP, which is the workload of a certain work center or department on a specific day. Workload is summarized per day and work center. This means, for example, that even if only four parts are processed in a specific work center on a specific day, the result is still displayed as a total workload.
The capacity requirements calculation must have been performed.
There are no system effects.
Retrieve the work center for which you want to study the work load.