Perform Schedule Analysis
Explanation
This activity is used to view production schedules in a graphical format,
and to compare the proposed schedules in relation to the demands, the line rate, and
the actual schedules for the same period. 
Prerequisites
Production schedules must exist.
System Effects
As a result of this activity you can view schedules in 
a graphical format.
Window
Production Line Management
Related Window Descriptions
Production Line Management
Production Line 
Management/Schedule Analysis
Detail
Procedure
	- Open the 
	Production Line Management window.
- Select the required production line that you need 
	to perform the schedule analysis from the Production Line list box.
- Click the 
	Schedule Analysis tab.
- Select the appropriate data and click Refresh Graph. The graphs will be 
	displayed in the 
	Graphic tab pane.
- If you want to get a detailed view of a point in 
	the graph, click on the desired point and the 
	Detail dialog 
	box will display it.