Recalculate Period Template

[About MRP Graphs] [To Perform MRP]

Explanation

Use this activity to recalculate the period template that is selected in the MRP Material Plan Graph window.

Prerequisites

This activity requires the existence of an Inventory (MRP) part, along with a period template.

System Effects

As a result of this activity, the system recalculates the selected period template's begin date to match the date you have specified in the Recalculate Period Template dialog box.

Window

MRP Material Plan Graph

Related Window Descriptions

MRP Material Plan Graph
Recalculate Period Template
MRP Graph Parameters

Procedure

  1. In the Material Plan Graph window, specify the Inventory (MRP) part number, site, and period template ID.
  2. Choose Recalculate Period Template from the right mouse button menu. The Recalculate Period Template dialog box appears with the period template's last recalculation date displayed in the Period 1 Begin Date field.
  3. Type the date that you want to use in place of the default value in the Period 1 Begin Date field.
  4. Click OK to recalculate the period template to use the date that you entered as the period template's begin date.