Release

Explanation

Use this activity to release a specific DOP order manually.

Prerequisites

This activity requires that the DOP order has a status of Unreleased or Netted. If the DOP order is serial effective, serial numbers must be reserved.

System Effects

As a result of this activity, the system releases the selected DOP order. The status will be changed to Released, which will allow you to process the DOP order further. Pegged orders or requisitions are created in order to meet the remaining demand.

When releasing pegged, project-specific DOP orders, the system will generate project-specific shop orders or purchase requisitions/purchase orders depending on the part type. These orders will be received into project inventory. If the DOP netting method on the DOP order had been set to AutoNetting, the DOP order will be automatically netted upon release. 

A check is done before release to see if the routing is buildable or null. If the routing still is plannable or has become obsolete a DOP log is created.

If this DOP order was connected to a project activity and if there were shop orders that had been connected to this DOP structure they will start reporting committed cost and hours back to the activity through the DOP order. These will be reported along with the specific project cost elements that have been previously defined.

Window

DOP Order

Related Window Descriptions

DOP Order
DOP Order/Detail

Procedure

  1. Select the DOP order you want to release.
  2. Right-click and click Release.
  3. A dialog box will be opened asking  "Do you want to release this DOP order(s)?" Click Yes.