Set Production Line Run Rate
Explanation
This activity is used to set a date-effective daily line
rate for the production line. This rate represents the planned maximum or
optimum production rate total, for the parts to be produced per day. This figure
is used in production schedule loading routines as a capacity figure. The line
rate is also used as a display, to compare the preferred line rate to the current
schedule loads, current demands, etc.
Prerequisites
A
production
line must have been defined.
System Effects
N/A
Window
Production Line
Management
Related Window Descriptions
Production Line Management
Set Production Line Rate
Procedure
- Open the
Production Line Management
window.
- Right-click and then click Set Line Rate.
- In the dialog box that opens, you can compare the current
run rates and phase-in dates with the average daily demand.
- Enter the effectivity date. (The sample demand start
date automatically appears in the Sample Demand Date field in the
Production Line Management
window.)
- Click Refresh
Table. The current
line rates for the effectivity date and the phase in dates (subsequent to
the effectivity date) will appear.
- If you want to remove
the existing dates subsequent to the effectivity date, select the Remove existing date following
this dates check box.
- Enter the daily production. The default value is
based on the last takt time sample.
- Click OK.
- You can remove, modify existing run rates,
and enter new run rates on the
Line Rates tab.