View MRP Material Plan by Periodic Template
Explanation
Use this activity
to view the summary of supply and demand quantities for an MRP-planned part using
the periods
specified by a template. You can also recalculate the period template details
from this tab.
Prerequisites
- The material requirements calculation must have been performed for the part.
- The period
template must have been defined.
System Effects
As a result of this activity, the system displays availability details
about an inventory part using the periods specified by a
template.
Window
MRP Material Plan
Related Window Descriptions
MRP Material Plan
MRP Material Plan
Multi-Site/Material Planning By Template
Select Period Template
Recalculate Period Template
Procedure
- Open the MRP Material Plan window.
- Retrieve the part for which you want to study the specified information. Use either the
Query
or Populate function to retrieve the information.
- Click the
Material Planning by Template tab to view
the availability details for the part calculated by MRP using
the periods specified by a template.
- To change the period template, right-click and then click Select Period Template. Select the period template in the Template ID field.
Click List
to select from the available period templates. Click OK.
- To update the period template details, right-click and then click Recalculate Period Template. Select the begin date for the first period in the Period 1 Begin Date
field and select the calendar in the Calendar ID field. Click List
to
select from the available calendars.
- Click OK.