PMRP Basic Data

[About PMRP]

[To Perform PMRP]

Usage

Use this window to setup project material requirements planning (PMRP) message controllers and PMRP message configurations. The PMRP Message Controller tab contains a table where users can define message controllers per planner ID. The PMRP Message Configuration tab is where users can configure the messages they would like to see as the result of the PMRP process.

For the description of each tab in the window, follow the appropriate link: PMRP Message ControllerPMRP Message Configuration and PNG Default Settings

Activity Diagrams

N/A

Activities

N/A