Use this tab to study expected receipts and deliveries of the part. Existing material/gross requirements as well as planned and proposed receipts from project material requirement planning (PMRP) are displayed. This tab explains how the PMRP calculation works as it shows the result of the net calculation step within the PMRP calculation.