Routing Operation and Load Analysis Parameters

[About Production Line Management] [About Takt Time Calculation] [About Production Line Rates] [About Production Schedule Load Methods] [About Proposed Production Schedule]

[To Repetitive Planning]

Usage

Use this dialog box to set a production line part routing operation revision, and the alternative to be used in the Routing Operation and Schedule Load analysis. You can enter the values for the parameters such as the lot size, setup time, and run time, to calculate the operation duration. The routing revision and the alternative information and parameters are stored as a snapshot, and used to calculate the consolidated operation durations.

Activity Diagrams

Production line management

Activities

Perform line operation analysis