Enter Analysis Results for Shop Order
Explanation
Use this activity to enter analysis results for a shop order. This optional
task is to be performed by a system administrator or equivalent person.
You can change the status of an analysis to Complete. Only results with this status are considered when creating control charts or calculating capability indices.
Once the line has this status, the results can not be edited. You can also create a new control chart
if SPC is
activated in the Control Plan.
When all
test operations have been reported, you can confirm the status for one or
more analyses. Multiple analyses can be confirmed in the
Analysis window.
Once an analysis has been confirmed, the results cannot be edited.
The
data points will be sorted according to the selected Sort By option.
Prerequisites
This activity has the following prerequisites:
- The analysis must have been created in IFS/Shop Order.
- To be able to enter the analysis results, an analysis must be in
the Planned status.
System Effects
As a result of this activity:
- Results are entered
for the analysis.
- Results can be used in the creation of various IFS/Quality Management
charts.
- If receipt of goods on the shop order was prevented because the
Receipt Not Allowed check box was selected for the associated control
plan, it is possible to receive the goods once the analysis is confirmed.
Window
Analysis Results
Related Window Descriptions
Analysis Results
Analysis
Analysis Results History
Procedure
To perform this activity, follow these steps:
- Open the
Analysis Results window.
- Query for the analysis.
- Select the
line for which you want to report results.
- If the data type is Attribute, enter your results in the Nonconformities (c/u) and/or
the Nonconforming (np,p) fields in the table.
- If the
data type is Variable, enter your results in the Result field by entering as
many measurement values as the specified sample size.
- Save the changes.
- To change the status to Complete, right-click and then click Complete Registered
Results.
Once the line has this status, the results cannot be edited.
- To create a new control chart if SPC is
activated in the control plan, right-click on the line and click Create SPC
Chart.
- To print a test instruction, right-click in the header of the window and then click
Print Test Instruction. This test instruction includes all control plan lines.
- To add document text to any line, right-click and click Document Text.
- To print a report of your results for any line, right-click and click Print Data
Sheet.
- To confirm a single analysis, right-click in the header of the analysis
and then click Confirm Registered Results. Once an analysis has been
confirmed, the results cannot be edited.
- To confirm multiple analyses, select the analyses in the
Analysis window, and then
right-click and click Confirm Registered Results.
- When the analysis results are confirmed, the values
in the Variable Result Status and Attribute Result Status
fields are calculated automatically.
Note: To view analysis results history, right-click on the
Control Plan
- Manufacturing window and click Analysis Results History.