Move Package Unit
Explanation
This activity is used
to move package units between handling
units as desired within the structure. This is done by a simple drag-and-drop
operation of
the package units. You can place individual package units on
a preferred handling unit according to the rules below.
- Package units with different contents cannot be
placed on a homogeneous handling unit. If a package unit with different
contents is placed on a homogeneous handling unit, the handling unit type
will automatically be changed.
- One package unit cannot be placed on another package
unit.
Prerequisites
- At least two handling units must have been created.
- Package units must have been added to at least one of the handling
units.
System Effects
- The package unit is moved to the new handling unit.
Window
Shipment
Related Window Descriptions
Shipment
Shipment/Package
Structure
Procedure
- Query for a specific shipment ID.
- Click the
Package Structure tab to
view the package structure details.
- Expand the shipment ID by selecting it.
Modify structure on handling unit level:
- Expand the handling unit to view all the package units added to the handling unit.
- Drag the package unit to the preferred handling unit folder.
Note: Rules apply when moving package units within the package
structure. Refer to the Explanation section for more details.