Add Project to Sub Contract
Explanation
One or more projects can be used to execute/perform a sub contract and so it
is possible to enter several projects on a contract but only one of them can be
defined as the default project. If a project is added to an item, it is required
to specify an activity for it. If you have selected the Activity Required
check box in the Sub Contract/General tab, it will be required to
specify a project activity for each item on the contract.
If a project and activity have been connected to the sub contract, an error
message will be displayed when you attempt to modify or delete the default
project activity sequence, and there are valuations which have been created
which use this project activity sequence. Likewise, an error message will be
displayed when connecting an Activity Sequence that has a status of Completed,
Closed or Cancelled.
Prerequisites
- The sub contract header must exist.
- The sub contract and project(s) must be within the same company.
System Effects
- A project and an activity is added to the sub contract.
Window
Sub Contract
Related Window Descriptions
Sub Contract/Project
Procedure
- Open the
Sub Contract window and query (F3) for the
necessary sub contract.
- Click the
Project tab and create a new record (F5).
- In the Project ID field, enter the project. Use the List of
Values to select from all existing projects in IFS/Project that belong to
the same company as the sub contract (provided that you have access to these
projects).
- Select the Default Project check box if this is to be the default
project for the sub contract. If projects exist on a sub contract, it is
required to select one project as default. Therefore, if entering the first
project on a sub contract, the Default Project check box must be
selected before the record can be saved.
- If required, enter an activity for the project and any relevant
notes.
- Save the information (F12).