Activate Sub Contract Revision
Explanation
This activity is used to activate a sub contract revision. A sub contract
revision can be set to the Active status once it has been
approved. An active sub contract revision is necessary to perform the
following:
- Award the sub contract
- Set the invitation to
tender baseline
- Set the contract baseline
An active sub contract revision can be modified as long as it is not
Frozen, and if the Audit Trail Enabled check box is selected, all changes made to the
sub contract will be logged. When you are activating a sub contract revision, and another active revision already exists,
a message is displayed requiring approval for setting the current active
revision to obsolete.
Prerequisites
- The sub contract should be in any of the following statuses: Planned,
Released, Submitted, Awarded, Under Review or Active.
- The sub contract revision must be in the Approved status.
System Effects
- The sub contract revision is set to the Active status.
Window
Sub Contract
Related Window Descriptions
Sub Contract/Revision
Procedure
- Open the Sub Contract window and query (F3) for the
necessary sub contract.
- Click the
Revision tab.
- Select the revision, right-click, point to Status, and then click
Set Active. The
Activate Sub Contract Revision dialog
box opens.
- Select the check boxes, as desired.
- Click OK.