It is extremely important that you set up and work within your own site to maintain your data integrity. If you work within any other site, you will compromise your own exercise data as well as the data of other students. Predictable exercise results require that your data be isolated in your own site. |
Purpose: The purpose of this exercise is to set up necessary data to perform repair in MRO.
Prerequisites:
Define Work Scope,
Releasing CAMRO Interim Order Structures,
Performing Disassembly,
Performing Disposition.
Windows:
CAMRO Interim Order Structure
Site | Order Part Number | Part Description | Repair Order No |
Your Site | XX_C | Module C, Turbine |
Purpose: The purpose of this exercise is to execute a repair shop order created during the disposition process. Material that is found to be in need of repair and material that has modification work indicated for it will be dealt with through the repair process. The repair process has two possible paths - internal repair and external repair. This exercise focuses on the internal repair process.
Windows:
MRO Shop Order
Receive MRO Shop Order
CAMRO Interim Order Structure
You may repeat this process for any other repair orders that you may have created for this overhaul visit. You will not be able to re-assemble the overhaul part until all repair orders are received.
Purpose: The purpose of this exercise is to check whether the structure is complete according to the template structure and to check that all serials are defined as valid alternates in the template structure in VIM
Prerequisites:
Define Work Scope,
Releasing MRO Interim Order Structures,
Performing Disassembly,
Performing Disposition.
Windows:
MRO Shop Order
CAMRO Interim Order Structure
Task Summary
Note: You have to finish processing all the disassembly, disposition and repair shop orders before running the preliminary conformance check. Once you have completed the repair shop order, use the lowest level assembly shop order in the CAMRO Interim Order Structure window to run the check. It can be run several times as the assembly levels are built up.
The assembly shop order for the part PP/XX_A1 is considered for this exercise. You can use the same CAMRO Interim Order Structure window used for above exercise. Select the Tree Structure/Assembly tab. There are several ways to run the preliminary conformance check.
Select the assembly shop order for the part PP/XX_A1 from the graphical object structure, right-click and then click Run Preliminary Conformance Check.
Select the assembly shop order for the part PP/XX_A1 from the graphical object structure, click the Supply Orders tab. Select the order line, right-click and then click Run Preliminary Conformance Check.
Open the relevant assembly shop order, right-click in the header and then click Run Preliminary Conformance Check.
This check is based on the expected on log in the Task Summary/Expected On Log tab and if there is any mismatch in the structures, you can see the log details at MRO Manufacturing/Interim Order/Maintain Order Structure/Prelim. Conformance Log tab. The log will be empty if there is no error.
You can proceed with the assembly once you receive a message saying that preliminary conformance check has been completed.