Basic Data Setup
Discrete Manufacturing Overview Racing Engine
Purpose: The purpose of this exercise is to create the
required data that will be used in the Discrete Manufacturing exercises. This
sets up data for your site and needs to be done only once for the Discrete
Manufacturing courses exercises.
- Set up your site for discrete manufacturing of racing engines.
General
exercise for Overview of Discrete Manufacturing Data
Required Data
Inventory Part Balance
Purpose: The purpose of this exercise is to ensure that
you have the correct quantities of parts available for the main exercises.
Windows:
Inventory Part Currently On Hand
Receive Inventory Part
- Open the Inventory Part Currently On Hand window.
- Verify that you have the quantity of part shown on the table below. If you
do not have enough parts, receive the appropriate number for each part so that the indicated quantity will be
available.
Site |
Part Number |
Part Description |
Quantity Available for Manufacturing |
Your Site |
21-421 |
Camshaft, Untreated |
at least 10 |
General exercise for Receive
Inventory Part
Shop Order
Purpose: The purpose of this exercise is to set
up a manually created shop order with the default information that will be
processed in the exercises below.
Windows:
Shop Order
Note: Record the shop order number so that it will be
easy to identify the correct shop order for the exercise.
- Create a shop order for the part and lot size shown in the table
below.
Site |
Part No |
Part Description |
Lot Size |
Earliest Start Date |
Shop Order Number |
Your Site |
21-321 |
Camshaft, Treated |
10 |
At least two work days after today |
|
General
exercise for Creating Shop Orders Manually
Main Exercises
Purpose: The purpose of these exercises is to process a shop
order that has subcontracting work in the routing. We are using part
number 21-321 (Camshaft, Treated) because it has a subcontracted operation
(20).
Windows:
Shop Order
Shop Order/Operation
Shop Order/Material
Purchase Requisition Lines
Register Purchase Order Arrivals
You are the person responsible for maintaining the shop order
information. Today you need to enter and process the following events for
the shop order:
-
Release the shop order and the outside operation.
-
Issue the component material to the order and report the
operations prior to the outside operation.
-
Ship the work in process (WIP) to the supplier.
-
Process the purchase requisition, which was automatically
generated for the outside operation, through the purchasing process
to receipt.
Release the shop order and the outside operation.
- Open the
Shop Order window and query for the shop order for this
exercise.
- Right-click anywhere in the window header and then click Release. This will release the order which, in turn, releases the
operations. Releasing the outside operation automatically generates a purchase
requisition for the subcontracting work.
Note: The operation can be released before the order so
that the purchasing process could begin before the order is released. However, if this is not required, a step can be saved by releasing the shop
order as we just did.
- Right-click anywhere in the window header, click Report. This will open the
Report Shop Order Operation form with your order queried.
- Click the
Subcontract
tab. Scroll to the
right until you can see the Req. No field. Verify that there is a
value in this field and record that value below for future reference. (This
value is the
purchase requisition number generated for the outside operation.)
Purchase Requisition Number |
|
Issue the component material to the order and report the operations prior to the outside
operation.
- Return to the
Shop Order window or open it if the window is
closed and query for your shop order. Click the
Material
tab, and select the row for component part 21-421 (Camshaft, Untreated). Right-click on the row and
then click Reserve.
- Verify that the value for the Qty Assigned field has changed to
10. Verify that the value of the State field has changed to
Reserved.
- Right-click anywhere in the window header, point to Material Actions, and
then click Issue. Select the Issue all reserved material
check box
and click OK.
- Verify that the value for the Qty Issued field has changed to 10
and the Qty Assigned field has changed to 0.
- Right-click anywhere in the
header, and then click Report.
- Click the
Operations tab,
select the row for operation 10 (Prep Camshaft), right-click on the row, and
then click Report Time.
- Verify that the value of the Operation State has changed to Closed
and that the value of the Qty Complete field has changed to 10.
Note: The amount of WIP that you can ship to the supplier is limited to the
quantity that has been completed by the previous operation.
Ship the work in process (WIP) to the supplier.
- Refresh the
Shop Order window, and click the Operation
tab.
- Select the row for outside operation 20 (Heat Treat
Camshaft), right-click on the row and then click Ship WIP to Supplier.
- When the Ship Outside Operation Items
to Supplier
dialog box displays, select the Ship Full Quantity check box and click OK.
Note: You can ship the WIP a portion at a
time or all at once.
Process the purchase requisition, which was automatically
generated for the outside operation, through the purchasing process
to receipt.
- Open the Purchase Requisition Lines window and
query for the purchase requisition number that you recorded above.
- Select the purchase requisition row,
right-click on the row, and then click Release.
- Right-click on the row again, and then click Requisition to Order.
- When the Requisition to Order Parameters dialog box appears,
click Auto Select.
- When the Purchase
Order(s) Successfully Created dialog box appears, record the
purchase order number for future reference and click the OK
button. This dialog box displays the requisition information
and the newly generated purchase order line to which it has been assigned.
- Right-click on the purchase requisition row again in the
Purchase Requisition Lines window, and then click Purchase Order. This
will open the
Purchase Order window and query the purchase
order to which your requisition was assigned.
- In the
Purchase Order window, right-click anywhere in the
header and then click Confirm.
- Verify that the value of the Status field has changed to Confirmed.
- Open the
Register Purchase Order Arrivals window and query
for the purchase order. Select the row for the purchase order, right-click
on the row and then click Receive Order.
- When the Receive
dialog box appears, click OK.
- Return to the
Shop Order window and refresh it to see the
changes to your shop order or open it if the window is closed and query for
your shop order.
- Click the
Operation
tab (if it is not the tab selected) and verify that the value for the Remaining Qty field has changed to
0 and that the value for the Outside Qty Shipped field has changed to
10.
Process an outside operation using the
backflushing options.
- Open the
Shop Order window
and query for your shop order. Copy this shop order and take note of
the new shop order number.
- Modify the value
in the Outside Op Supply Type
field to Released Purchase Order.
- Modify the value
in the Outside Op Backflush
field to Purchase Order Arrival.
- Right-click anywhere in the window header and then click Release. This will release the order,
which in turn, releases the
operations. Releasing the outside operation automatically generates a
released purchase
order for the subcontracting work.
- Right-click anywhere in the window header, and then click Report. This will open the
Report Shop Order Operation window
with the order you retrieved.
- Click the
Subcontract tab, select the
row for operation 20 (Heat Treat Camshaft), right-click on the row, and then
click Outside Operation Reporting.
- When the
Outside Operation Reporting
dialog box opens, select the Report Full Quantity
and the Auto Report Preceding Operations check boxes, and click OK.
- Verify that the value of the Operation State
field has changed to Closed,
and that the value of the Qty Complete field has changed to 10.
- In the
Shop Order window,
query for your shop order and see the
changes.
- Click the
Operation
tab and verify that the value for the Remaining Qty field has changed to
0 (zero), and that the value for the Outside Qty Shipped field has changed to
10.