It is extremely important that you set up and work within your own site to maintain your data integrity. If you work within any other site, you will compromise your own exercise data as well as the data of other students. Predictable exercise results require that your data be isolated in your own site. |
Purpose: The purpose of this exercise is to familiarize you with the data that must be in place before you can do the the exercises below.
General exercise for Defining Inventory Parts
Purpose: The purpose of this exercise is to show you
how to calculate the gross
requirements for the delivery project.
Windows:
Project Product
Project Product/Demand
Project Product/Demand/MPL
Project Item
Verify that the correct required quantity has been calculated for each project item.
Look at the required date for each of the second-level standard planned project items. Note that this date is the early finish date of the project activity connected to the top project item minus its manufacturing leadtime.
Look at the required date of each project-specific project item 20–11XX (Engine Block 1600) and 20–10XX (Engine 1600). This date should reflect the early finish date of the activity connected to the item.