Use this window to view all information about operational planning. When you define an operational plan, you need to decide whether it is to cover single operations over a longer period of time or daily operations. For daily operations, select the Daily check box in the General tab. If the date entered in the Start Date field in the General tab is more than two months ahead, you will receive a warning.
To implement an operational plan containing material and personnel planning, you first need to set it to complete using the Plan Complete check box in the General tab. This, in turn, requires items to be defined in the Define Vehicle Models tab. After a plan is set to complete, neither the plan nor its material requirements can be revised.
For a description of each tab, follow the appropriate link: General, Define Vehicle Models, Assign Vehicles and Crew.