Use this tab and its sub tabs to view rolled up requirements for the selected maintenance order structure. Rolled up requirements refer to the aggregated demand for resources and tools-and-facilities for a maintenance visit. The scope of a visit is signified by the tasks which are connected to the maintenance order (work package) for that visit.
When working in the Maint. Order Str./Demand Roll Up sub tab, you can view rolled up requirements for an entire visit or for a selected level and below in the visit scope depending on the structure node you select in the graphical object structure (shown to the left of the tab). This graphical object structure represents the scope of the maintenance visit.
When working in the Exec. Logic/Demand Roll Up sub tab, you can view rolled up requirements for an entire Execution Logic Structure (ELS) or for a selected grouping node depending on the structure node you select in the graphical object structure (shown to the left of the tab). This graphical object structure represents the ELS that was created to support the arranging, grouping and sequencing of the contents of the maintenance visit.
In this tab you can set the timescale by which the rolled up requirements are to be aggregated. To do this, select from the three predefined periods, i.e., Date, Week and Month. The rolled up requirements will be displayed in the relevant sub tabs.
For the description of each tab in the window, follow the appropriate link: Resources, Tools and Facilities.