This activity is used to define dependencies between operation lines within a particular separate standard job, PM action and/or work order. The relationships defined would be useful when rescheduling operation lines.
Operation lines must have been defined for the standard job, PM action and/or work order.
As a result of this activity, operation lines will be connected to each other in a Predecessor - Successor (Parent - Child) relationship that can be used during scheduling.
Separate Standard Job
Separate PM
Action
Prepare
Work Order
Work Order Execution
Logic
Separate
Standard Job
Separate
Standard Job/Operations
Separate PM Action
Separate PM Action/Jobs
Separate PM
Action/Operations
Prepare
Work Order
Prepare Work Order/Jobs
Prepare Work
Order/Operations
Work Order Execution Logic
Work Order Execution
Logic/Operations
Predecessors
- Separate Standard Job
- Separate PM Action
- Prepare Work Order
- Work Order Execution Logic
Note: You can also perform the above steps on the Separate PM Action/Jobs and Prepare Work Order/Jobs tabs. The changes made will be reflected on the Operations tab of the respective windows.