Disconnect Work Order from Project Activity

Explanation

This activity is used to disconnect a work order or a work order structure from a project activity. A work order can be disconnected only if it does not contain any cost transactions such as material, tools and facilities, operations, and so on. 

Prerequisites

System Effects

As a result of this activity, the work order will be disconnected from the project activity, and it will not appear as a connection on the Project Navigator/Connections tab in IFS/Project.

Window

Prepare Work Order 

Related Window Descriptions

Prepare Work Order
Prepare Work Order/General
Historical Work Orders 
Historical Work Order/General

Procedure

  1. Open the Prepare Work Order window.
  2. Query for the connected work order (F3).
  3. Right-click anywhere on the window, point to Project Connections, and click Disconnect from Activity
  4. If the selected work order is connected to a structure, an information message appears. Click Yes if you also want to disconnect all work orders below the selected work order in the structure. When you click Yes, the Project Connected check box in the General tab will be cleared for the selected work order and all work orders below it. When you click No, the check box will only be cleared for the selected work order.