Handle Status on Design Object
Explanation
This activity is used the change the design status of a design object. The 
following actions are used to change the design status:
  - Set Planned for Operation
- Set Completed
- Set ReDesign
- Set Planned for Scrap
- Set Scrapped (for design status only). This command also exists for
    operational status. Refer to Activity Set
    In/Out of Operation for details on changing operational status.
 Refer to About
Object Status for a complete description of status change (both design 
status and operational status). Refer to About
Status Changes and IFS/Equipment for details on data transferred between the
two products.
Prerequisites
A design object must exist in IFS/Asset Design.
System Effects
Changing the design status may cause one or more of the following to occur:
  - The design status is changed to another status.
- A parallel equipment object is created in IFS/Equipment and data is
    transferred to it from the design object. If the equipment object
    already exists in IFS/Equipment, only data is transferred. 
- The design object's Functional Object Information command is
    activated and enables navigation from the design object to the
    equipment object within IFS/Equipment.
- Within the Business Object Explorer a small overlay may appears on the object's icon
    indicating a change in design status. The object should be refreshed in the 
	navigator to view the change. To do this right-click on the design object 
	and click Refresh. 
- The operational status (for both the design object and the equipment
    object) may be affected.
Window
Design Object
Design Objects
Linear 
Assets
Related Window Descriptions
Design Object
Design Objects
Linear Assets
Procedure
	- Open the Design Object window or the 
	Business Object 
	Explorer if you want to change the status for one object and open the 
	Design Objects or
	Linear Assets windows you want to change the status for many objects. 
	
- Search for or locate the required design object or design objects. If more than 
	one design object is displayed, select the design objects.
- Right-click, click Status and then click the required status 
	change. 
Use the following procedure to change the status of design objects in a 
structure:
	- Open the Design Object,
	Design Objects, or 
	Linear Assets window. 
- Search for the required design object. Select the design object.
- Right-click and click Change Status on Structure. The 
	Change Status on Structure dialog box opens.
- In the Change Object Status to field, select the status to change to, 
	from the drop-down list. 
- In the Select Structure to Change group of fields, select either 
	the Functional Structure or Locational Structure 
	check box, depending on the type of 
	object structure required to be changed.
- Select the Ignore Objects with Invalid Status 
	check box to apply the status change on those objects in the structure for 
	which the change is possible and to disregard those for which it is not.
- Select the check box for either Run as Background
	Job or Refresh Client, depending on if you want to run 
	the status change as a background job, if time consuming, or to refresh the 
	form from which the status change is being performed so that the change will 
	be visible immediately after the operation is complete. 
- Click OK.