Change Status on Structure
Explanation
This activity is used to change the status of an object and its child
objects within a functional or locational structure, at the same time. The
change in design status occurs downwards and affects only the object's child
relations. Parent relations are not affected. The design status cannot be
changed for a nonexistent structure; in other words, if the structure does not
exist, the command to change it is ignored. It is not possible to change the
structure into an invalid status. The Ignore Objects with Invalid Status
option is available in order to skip any objects in the middle of the structure
with a different status and continue the changes for the rest. If the status
change process is time consuming, it is also possible to select to run it as a
background job. Always review the object's relations and/or the object's class
relations before changing an entire object structure.
Prerequisites
A structure comprising of child objects, should exist for a selected object.
System Effects
- The status of the object and child objects is changed to the selected option,
if the status change is valid for the objects.
- All system effects due to the status changes will be applied.
Window
Design Object
Design Objects
Linear
Assets
Related Window Descriptions
Design Object
Design Objects
Linear Assets
Change Status on Structure
Procedure
- Open the Design Object window
or locate the design object in the Business Object Explorer if you want to
change the
structure on a structure for one object. Open the
Design Objects or
Linear Assets windows
if you want to change the status on the
object structure for many objects.
- Search for the required design object. Select the design object.
- Right-click and click Change Status on Structure. The Change Status on Structure dialog box opens.
- In the Change Object Status to field, select the status to change to,
from the list.
- In the Select Structure to Change group of fields, select either
the Functional Structure or Locational Structure
check box, depending on the type of
object structure required to be changed.
- Select the Ignore Objects with Invalid Status
check box to apply the status change on those objects in the structure for
which the change is possible and to disregard those for which it is not.
- Select the Run as Background
Job or Refresh Client check box, depending on if you want to run
the status change as a background job, if time consuming, or to refresh the
window from which the status change is being performed so that the change will
be visible immediately after the operation is complete.
- Click OK.